Newbuilding Solutions
Block construction and structural carpentry at Tier-1 quality. Fast-track on-site prefabrication that meets shipyard deadlines.
20+ years maritime expertise. Self-sufficient deployment. Steel, aluminium, composite systems integration.
Certified team. Transparent operations. Proven experience across European shipyards.
WPS and IACS Rec. No.47 (Shipbuilding Quality Standard) compliance. Strict quality control, distortion management and construction tolerances from Tier-1 operations.
20+ years naval experience. Project direction by Deck Officer (Saipem), 3 years at Tier-1 shipyards and 3 years as Naval Site Foreman. Seasoned methodology.
Full equipment kit mobilized. 7x 380V welders, cutting sets, consumables, tooling. Minimal site requirements. Your facility provides space—we deliver capability.
All welders and carpenters are RINA/LLOYDS certified. Full compliance documentation and traceability. Direct experience at Tier-1 shipyards. Transparency by default.
Block prefab, on-site carpentry, full refit coordination. Work under your protocols. Scale from specialist support to comprehensive project management.
Mediterranean positioning. Capable of rapid mobilization for French, Italian, and Northern European shipyards. Cost-efficient logistics for regional operations.
SS SRLS was born from ship repairs. We're on-site to solve your problems: structural interventions, hull plating inserts, tank repairs, urgent work. We also operate in block construction and carpentry for newbuilding and major refit.
Management: Principal with 20+ years in the naval sector, consolidated background in ship repairs. Site Manager with Deck Officer experience (Saipem), 3 years at Tier-1 shipyards and 3 years as Naval Site Foreman with SS SRLS.
Operations Team: Welders and carpenters with RINA and LLOYDS certifications, trained on newbuilding standards. Proven experience in naval steel, structural aluminium and stainless steel. Capable of technical drawing interpretation, marking, block prefabrication, in-situ trimming and full penetration welding. Operational on cruise ships, superyachts, offshore vessels and military units. Principal, Site Manager and Equipment Specialist with PTW Supervisor certification, forklift and MEWP licenses.
Approach: Operational problem-solving. Ship repairs, block construction, structural carpentry, precision welding. Tier-1 quality control and WPS adherence across all projects.
Our core business. We're on-site to solve your problems: hull plating inserts, tank repairs, urgent structural interventions. Direct experience in refit environment where every day counts.
Steel and aluminium block assembly for newbuilding and major refit projects. Dimensional precision, distortion control, full prefab capacity.
Hull plating, frames, structural reinforcement. Full WPS compliance. Tier-1 newbuilding methodologies applied to all refit work.
Carbon steel, stainless, cupro-nickel, cunife piping. Workshop prefabrication and on-board installation with quality control oversight.
Installation of bow thruster protection grids on complex geometry. The raked and flared bow configuration required meticulous in-situ adaptation: oxy-acetylene torch trimming of all edges, progressive positioning using hoist systems on padeyes, centering and rotation according to technical specifications in the presence of owner representatives and yard markers. Final wire-feed welding to hull plating.
Workshop prefabrication of 2 structural modules for material loading platform extension. HEA 140x140x10 beams, angles 60x40x6 and 80x60x8. Module dimensions: 8500x2000mm. Components supplied by shipyard, assembly and wire-feed welding with full penetration performed by SS SRLS per WPS.
Plate replacement and structural inserts on hull plating and internal compartments. Work performed across various spaces: engine room, tanks, superstructures. Cutting, bevel preparation, in-situ fitting and full penetration welding per WPS with NDT controls.
Construction of 15m x 10m structural block for yacht extension project. Conversion from 90 to 100 meters in length. Complete prefabrication with structural integration, preparation for drydock insertion and junction to existing hull.
MIG/MAG • TIG • Electrode
0.8 - 2.0 mm
25m / 50m / 100m
Complete torch kits & cases